EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE EXPLANATION
CAMİŞ MINING ŞİŞECAM CHEMICALS KARABÜK / SAFRANBOLU 2018 2021 KARABÜK CAMİŞ MADENCİLİK İŞLETMESİNDE KUVARSİT OCAĞININ DELME PATLATMA YÖNTEMİ İLE ÜRETİLEREK TÜVENAN DÖKÜM SAHASINA NAKLEDİLEREK, TESİSTEN ÇIKAN ATIK MALZEMENİN STOK SAHASINA NAKLİ, MADENİN ÜSTÜNDE BULUNAN PASA MALZEMESİNİN DELME PATLATMA İLE ALINARAK STOK SAHASINA NAKLİ.
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
DSI 22nd REGIONAL DIRECTORATE KARS GÜMÜŞHANE 2016 2019
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE EXPLANATION
DSI 25nd REGIONAL DIRECTORATE ÇANAKKALE 2017 2019 850.000 M3 EXCAVATION AND 1.000.000 M3 FILLING FOR DRINKING WATER WORK OF BAYRAMİÇ DISTRICT OF ÇANAKKALE, 250 TONS STEEL PIPE PRODUCTION, 50.000 M3 REINFORCED CONCRETE AND 20.000 M3 OUTDOOR CONCRETE MANUFACTURING, ENERGY TRANSMISSION LINE AND MECHANICAL WORKS
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE EXPLANATION
DSI 22nd REGIONAL DIRECTORATE GÜMÜŞHANE 2016 2019 250.000 M3 RUBBLE ARBITRATION AND RESTORATION WORKS OF RIVER BED İN ORDER TO PROTECT KELKİT DISTRICT OF GÜMÜŞHANE FROM FLOOD, 100 TON ROADWAY RAİL, 50.000 M3 REINFORCED CONCRETE RETAINING WALL WORKS
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE EXPLANATION
DSI 23nd REGIONAL DIRECTORATE KASTAMONU 2017 2019 PRODUCTION OF 250.000 M3 EXCAVATION AND 275.000 M3 FILLING, 100 TON STEEL PIPES IN THE SCOPE OF AGRICULTURAL IRRIGATION OF İHSANGAZİ DISTRICT OF KASTAMONU PROVINCE, 10.000 M3 REINFORCED CONCRETE AND 5.000 M3 OPEN CONCRETE PRODUCTION, CONSTRUCTION OF 22 KM HDPE PIPING FOR 450 HA IRRIGATION AND ART STRUCTURES
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE EXPLANATION
SODA INDUSTRY INC. MERSİN/TARSUS 2004 2018 MERSİN İLİ TARSUS İLÇESİNDE KİREÇTAŞI OCAĞININ AÇIK OCAK DELME PATLATMA YÖNTEMİ İLE İŞLETİLEREK FABRİKAYA NAKLİ AYRICA ÇIKAN PROSES ATIĞIN TAŞINMASI İŞLERİ.
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE EXPLANATION
ÇANAKKALE 18 MART ÜNİVERSİTESİ ÇANAKKALE 2015 2017 ÇANAKKALE 18 MART ARAŞTIRMA VE UYGULAMA HASTANESİ, YOĞUN BAKIM ÜNİTESİ,ACİL SERVİS,HASTA POLİNİKLERİ 150 YATAĞA SAHİP HASTA YATAK ODALARI 3 ADET AMELİYATHANE 1 ADET DOĞUMHANE ÖĞRETİM GÖREVLİSİ ODALARI DERSLİK VE SEMİNER SALONLARINDAN OLUŞAN BETONERME 6 KATLI
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
None VAN 2015 2017
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
None MERSİN 2014 2017
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
DSI 6th REGION. DIRECTORATE. ADANA MERSİN 2016 2017
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE EXPLANATION
GENERAL DIRECTORATE OF HIGHWAYS ADANA 2013 2017 +0,002 to + 41,932 41 km road of 22,000 m3 volume of art structures, 5-opening 107 meters long and 12 meters wide bridge, 8,000 m3 concrete and formwork, prestressed steel work, 3,000 meters 100 bored piling works, 72,000 m3 masonry stone wall construction, 14 km performance resistant guardrails, 2.400.000 m3 solid fill, 2.000 tons of iron work, covering the gates and landscaping.
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE EXPLANATION
CACIMLER İNŞAAT (CONSTRUCTION) VAN 2015 2017 8 floors, 16 flats total closed area of ​​3350 m2 business center 9.000 m2 concrete formwork, 5.000 m3 reinforced concrete, 320.000 kg iron work, insulation and exterior coating, landscaping and all fine workmanship construction.
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
SODA INDUSTRY CO. / MERSİN MERSİN 2014 2017
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
CIMSA CEMENT INDUSTRY AND TRADE. Inc. MERSİN 2014 2017
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE EXPLANATION
DSI 5th REGIONAL DIRECTORATE ANKARA 2014 2016 1000m spillway mold workmanship with a height of 7.60 meters, width of 13 meters and length of 230 meters, 7000 m3 reinforced concrete production, 12.000 kg iron workmanship. The diversion structure of 310 m2 formwork with 1 meter in diameter and 148 meters in length, 750 m3 concrete production, 37.500 kg solvent free epoxy steel tube production. Construction of 3 heel drains of 12 m2 gross, filling of 725.00 m3 floor and filling of gravel of 113.000 m3.
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
None MERSİN 2013 2015
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
11TH REGIONAL DIRECTORATE OF HIGHWAYS VAN 2015 2015
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
None MERSİN 2014 2014
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
None MERSİN 2013 2014
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
DSI 6th REGIONAL DIRECTORATE / ADANA ADANA 2011 2014
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
SODA INDUSTRY CO. / MERSİN MERSİN 2012 2014
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
SODA INDUSTRY CO. MERSİN 2013 2013
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
MERSİN ARPAÇBAHŞİŞ MUNICIPALITY MERSİN 2013 2013
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
DSI 17th REGION. DIRECTORATE. VAN VAN 2011 2013
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
DSI 6th REGION. DIRECTORATE. ADANA MERSİN 2011 2012
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
SODA INDUSTRY INC. MERSİN 2012 2012
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
DSI 6th REGION. DIRECTORATE. ADANA MERSİN 2011 2012
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
DSI 6th REGION. DIRECTORATE. ADANA MERSİN 2010 2011
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
DSI 6th REGION. DIRECTORATE. ADANA MERSİN 2009 2011
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
11TH REGIONAL DIRECTORATE OF HIGHWAYS-VAN VAN 2009 2010
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
5TH REGIONAL DIRECTORATE OF HIGHWAYS / MERSİN MERSİN 2010 2010
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
5TH REGIONAL DIRECTORATE OF HIGHWAYS / MERSİN MERSİN 2008 2008
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
DSI 24th REGIONAL DIRECTORATE KARS KARS 2002 2006
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
11TH REGIONAL DIRECTORATE OF HIGHWAYS-VAN VAN 2005 2005
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
4th REGIONAL DIRECTORATE OF HIGHWAYS ANKARA ANKARA/NALLIHAN 2002 2005
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
11TH REGIONAL DIRECTORATE OF HIGHWAYS-VAN VAN 2004 2004
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE EXPLANATION
DSI 6th REGION MERSİN 1997 2001 Supply and installation of 2500 m, 400 in diameter; 1200 m, 500 diameter and 3000 m pipes of various diameters, 1000 m rectangular channel, earth fill pond
EMPLOYER ORGANIZATION LOCATION STARTING DATE COMPLETION DATE
DSI 17th REGION. DIRECTORATE. VAN VAN/ÖZALP 1994 1999